Gold Member Since 2015
Audited Supplier
Taizhou Macgo Machinery Co., Ltd.

Vertical Packing Machine, Vertical Packaging Machine, Food Packing Machine manufacturer / supplier in China, offering Auger Filling Packing Machine for Powder (MG-520), Automatic Chocolate Paste Spreading Machine, Chocolate Bean Depositing Machine (MGCM400) and so on.

(/ )

Supplier Homepage Product VFFS/Vertical form fill and seal machine Auger Filling Packing Machine for Powder (MG-520)

Auger Filling Packing Machine for Powder (MG-520)

FOB Price: US $8,000-10,000 / Set
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $8,000-10,000/ Set
Get Latest Price
Production Capacity: 10sets/Month
Transport Package: Wooden Cases
Payment Terms: T/T, Paypal

Request a custom order and have something just for you!

Send Customized Request
Product Catalog
Vertical packing machine
30 Products
Content
Product Image
Product Name
FOB Price
Port
Basic Info
  • Model NO.: MG-520
  • Application: Powder
  • Forming Species: Bag Moulding
  • Driven Type: Electric
  • Packaging: Bags
  • Trademark: MG
  • Origin: China
  • Automatic Grade: Automatic
  • Type: Forming Filling Sealing Machine
  • Forming Function: Forming
  • Material Type: Powder
  • Packaging Material: Film
  • Specification: CE
  • HS Code: 84223030
Product Description
  Reference:
ItemsContent
Packing speedMax 30 bag/min
Bag sizeFront width:100-180mm
Side width:50-90mm
Width of side seal:5-10mm
Length:100-350mm
Bag making modeBlock bottom type
The maximum width of packing film520mm
Air consumption0.8Mpa0.36M3/min
Main power/voltage43.5KW/220V 50HZ
Dimension(L)1600×(W)1400×(H)2000mm
The weight of switchboard750kg



The main components and brand of this machine as following:
 

NumberNameBrandCountry/Region
1Touch sensitive screenWEINVIEWTAIWAN
2PLCMITISUBISHIJAPAN
3Servo motorSIEMENSGERMANY
5Vertical cylinderSMCJAPAN
6Cutting cylinderSMCJAPAN
7Two units systemSNSTAIWAN
4Horizontal cylinderSMCJAPAN
8Solid state relayFOTEKTAIWAN
9Intermediate state relayOMRONJAPAN
10Photoelectric eyeAUTONICSKOREA
11PowerMWTAIWAN
12winding motorTAIBANGTAIWAN
13Thermometer controlOMRON/YATAIJAPAN/SHANGHAI

Other Information:
    1. Operation Manual: In English
    2. Installation team: Commissioning service provided, at buyer's account. We shall send about 1-2 technicians the installation and testing work takes about 3-10days.
    3. Training: Training to the local operator to be carried out by the supplier at the time of installation/ commissioning/ trial run at factory.
    4. Warranty: One year from the date of completion of the commissioning (except man-made damage, and the wearing parts, for example the drawing belt)
     5.Pre-shipment Inspection:
A). Supplier should trial run whole line at supplier's factory before shipment;
B). Supplier has to run the machine at least 1hour for each bag former
C). All raw materials for that trial run to be arranged by supplier at their cost.
Send your message to this supplier
Avatar
Mr. Arthur Zhang
Manager
*From:
To: Mr. Arthur Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now