Gold Member Since 2015
Audited Supplier
Taizhou Macgo Machinery Co., Ltd.

Tank, Fuel Tank, Oil Tanker manufacturer / supplier in China, offering 500L Industrial PLC Control Mixer, Automatic Heat Shrink Packaging Machine, High Speed Jam Filling Machine (sealed by reel film) and so on.

(/ )

Supplier Homepage Product Chocolate Machinery 500L Industrial PLC Control Mixer

500L Industrial PLC Control Mixer

FOB Price: US $5,000-7,000 / SET
Min. Order: 1 SET
Min. Order FOB Price
1 SET US $5,000-7,000/ SET
Get Latest Price
Production Capacity: 100sets/Year
Transport Package: Wooden Cases
Payment Terms: L/C

Request a custom order and have something just for you!

Send Customized Request
Product Catalog
chocolate machinery
50 Products
Content
Product Image
Product Name
FOB Price
Port
Product Attribute
Basic Info
  • Model NO.: MM500
  • Power: 7.5kw(Motor) 6kw (Electric Heating)
  • Net Weight: 1000kg
  • Discharge Way: Pneumatic Piston
  • Material: Chocolate Contact Parts Are Made of S.S,Other Part
  • Specification: CE
  • HS Code: 84229090
  • Capacity: 500L/Batch
  • Dimension: 1250*1000*1450mm
  • Mixing Time: 5-10min/Batch
  • Speed of Mainshaft: 30r/M
  • Trademark: MG
  • Origin: China
Product Description
Function:
This mixer is widely used in mixing the material solid-solid,solid-liquid.
It can be equipped with water jacket which can be heated by electrical heaters.

 
Main Parameter:
ModelMM500
Capacity500L/batch
Power7.5KW(motor)
6KW (electric heating)
Dimension1250*1000*1450mm
Net Weight1000KG
Mixing Time5-10min/batch
Discharge WayPneumatic Piston
Speed of Mainshaft30r/m
MaterialChocolate contact parts are made of S.S,other parts are made of carbon steel.
 REMARK:
1. Delivery Time:
Within 45 days upon the receipt of the deposit.
2. Terms of payment:
30% T/T in advance, the balance shall be paid before the shipment. 
3. Warranty period: one year
4. Others:
Testing & training:
The plant layout design, assembling,installation and debugging, start-up and local team training will be FREE at no cost. But the buyer should be responsible for the round-trip air tickets, local transportation, board & lodging ,and USD $40/day/person for the pocket money to our technicians. The testing engineer will be two person, and will cost 10-15 days.
Utilities:
The buyer should prepare sufficient electric power and other equipment supplies which are suitable to be connected to our machinery before our engineers start off.
Send your message to this supplier
Avatar
Mrs. Lydia
*From:
To: Mrs. Lydia
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now