Technical characteristics:
1.PLC control with stable, reliable biaxial high accuracy output and color touch screen, bag-making, measuring, filling, date printing, cutting and sealing in one operation.
2. Box-packaging bag is more elegant.
3. Servo motors driven, high precision orientation, size more nicety;
4. External film releasing mechanism: simpler and easier installation of packing film;
5. The process of vertical sealing can adjust the volume deviation automatically;
6. Stand bag with burns edges, 4 sides seal edges;
Application
It is suitable for packing granule or powder products such as peanuts, rice, milk powder, flour, sugar etc. Max volume 2000ml.
Technical parameters:
Type |
MG-420PM |
Bag length |
80-300mm(L) |
Bag width |
50-200mm(W) |
Max width of roll film |
420mm |
Packing speed |
5-40bags/min |
Measuring range |
150-1200ml |
Air consumption |
0.65mpa |
Gas consumption |
0.3m³/min |
Power voltage |
220V |
Power |
2.2KW |
Dimension |
(L)1320mm×(W)950mm×(H)1360mm |
wight of machine |
540Kg |
Remark:
1. Payment terms: By T/T, the 30% of total value paid in advance as down payment, the balance 70% paid before shipment
2.WARRANTY
For the quality of goods, the Seller gives the warranty of 24 months, issued on the day of its consignment, and guaranties that in the mentioned period will replace or repair on the proper expenses, in the proper factory all the parts, damaged as the result of defect materials of fault execution. The appeals in the warranty period have to be under the same period. The damages caused by the improper use, lack of knowledge of instructions or normal tear are excluded from the warranty.
3.MOQ: 1set
4. PACKAGING
The Seller is obliged to pack the subject of the Contract for the transport in the appropriate packaging, according to the Regulations of the Seller's country.
5.INSTALLATION AND COMMISSIONING
The installation and commissioning of the machine, as well as the training of the Purchaser personnel, are included in the contractual price.The request of installation and comissioning must be scheduled at least 2 weeks in advance. All necessary connectivity must be ready prior the service being scheduled,like water and compressed air supply and electricity connection.etc.
Upon arrival of our team at site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedures. The initial installation is provided within 5 working days excluding travel days.
The actual installation days may vary, based on different machine model and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
6.Delivery time: Within 35 days after down payment be made