Industrial 200kg Per Hour Hazelnut Roaster

Product Details
Customization: Available
Usage: Nuts
Power Source: Electric
Manufacturer/Factory, Trading Company
Gold Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

OEM/ODM Availability
Yes
Find Similar Products

Basic Info.

Model NO.
MTM200
Timing Device
With Timing Device
Type
Roasting Machine
Voltage
380V
Customized
Customized
Weight(Kg)
680
Power (Kw)
21-24
Output(Kg/H)
200
Overall Diamension(mm)
2700*1260*1550
If Customed
Yes
on Site Inspection
Welcome
Material
Carbon Steel
Transport Package
Wooden Cases
Specification
CE
Trademark
MG
Origin
China
HS Code
85167990
Production Capacity
100sets/Year

Product Description

Feature
 Main technical parameters
 1.This machine is a single-body roaster.It has a simple structure and it is very easy to operate.This machine uses the cycloidal reducer as driving,and the chains drive the turning cage to roast the materials.
2. This machine adopts the way of electric healing or gas heating to roast the food by far-infrared heat radiation from the pipe heaters.
3.This machine control the working temperature automatically by using the digital temperature controller.
4.Complete SS304 housing.
Model Weight(kg) Power (kw) Output(kg/h) Overall Diamension(mm)
MTM01
(Electric heating)
680 21-24 200 2700*1260*1550
MTM02
(Electric heating)
550 16 100 2300*1120*1390
MTM03       (gas heating) 680 1.1 200 2700*1330*1390
MTM04      (gas heating) 550 0.75 100 2300*1190*1290

The normal roasting temperature is 150-220°C, it takes about 35-45 minutes to roast one batch of products every time.


REMARK:
1. Delivery Time:
Within 45 days upon the receipt of the deposit.
2. Terms of payment:
30% T/T in advance, the balance shall be paid before the shipment. 
3. Others:
Testing & training:
The plant layout design, assembling,installation and debugging, start-up and local team training will be FREE at no cost. But the buyer should be responsible for the round-trip air tickets, local transportation, board & lodging ,and USD $40/day/person for the pocket money to our technicians. The testing engineer will be two person, and will cost 10-15 days.
Utilities:
The buyer should prepare sufficient electric power and other equipment supplies which are suitable to be connected to our machinery before our engineers start off.
4. Warranty period: one year

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier