Auger Filling Packing Machine for Powder (MG-520)

Product Details
Customization: Available
Automatic Grade: Automatic
Application: Powder
Manufacturer/Factory, Trading Company
Gold Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

OEM/ODM Availability
Yes
  • Auger Filling Packing Machine for Powder (MG-520)
  • Auger Filling Packing Machine for Powder (MG-520)
  • Auger Filling Packing Machine for Powder (MG-520)
  • Auger Filling Packing Machine for Powder (MG-520)
Find Similar Products

Basic Info.

Model NO.
MG-520
Forming Species
Bag Moulding
Forming Function
Forming
Driven Type
Electric
Material Type
Powder
Packaging
Bags
Packaging Material
Film
Transport Package
Wooden Cases
Specification
CE
Trademark
MG
Origin
China
HS Code
84223030
Production Capacity
10sets/Month

Product Description

  Reference:
Items Content
Packing speed Max 30 bag/min
Bag size Front width:100-180mm
Side width:50-90mm
Width of side seal:5-10mm
Length:100-350mm
Bag making mode Block bottom type
The maximum width of packing film 520mm
Air consumption 0.8Mpa0.36M3/min
Main power/voltage 43.5KW/220V 50HZ
Dimension (L)1600×(W)1400×(H)2000mm
The weight of switchboard 750kg



The main components and brand of this machine as following:
 

Number Name Brand Country/Region
1 Touch sensitive screen WEINVIEW TAIWAN
2 PLC MITISUBISHI JAPAN
3 Servo motor SIEMENS GERMANY
5 Vertical cylinder SMC JAPAN
6 Cutting cylinder SMC JAPAN
7 Two units system SNS TAIWAN
4 Horizontal cylinder SMC JAPAN
8 Solid state relay FOTEK TAIWAN
9 Intermediate state relay OMRON JAPAN
10 Photoelectric eye AUTONICS KOREA
11 Power MW TAIWAN
12 winding motor TAIBANG TAIWAN
13 Thermometer control OMRON/YATAI JAPAN/SHANGHAI

Other Information:
    1. Operation Manual: In English
    2. Installation team: Commissioning service provided, at buyer's account. We shall send about 1-2 technicians the installation and testing work takes about 3-10days.
    3. Training: Training to the local operator to be carried out by the supplier at the time of installation/ commissioning/ trial run at factory.
    4. Warranty: One year from the date of completion of the commissioning (except man-made damage, and the wearing parts, for example the drawing belt)
     5.Pre-shipment Inspection:
A). Supplier should trial run whole line at supplier's factory before shipment;
B). Supplier has to run the machine at least 1hour for each bag former
C). All raw materials for that trial run to be arranged by supplier at their cost.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier