Ice Cream Wafer Cone Baking Machine/Wafer Cone Baking Equipment

Product Details
Customization: Available
Certification: CE, ISO9001
Power Source: Electric
Manufacturer/Factory, Trading Company
Gold Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

OEM/ODM Availability
Yes
Find Similar Products

Basic Info.

Model NO.
MFM-12
Process
Thermal Processing
Automatic Grade
Semi-Automatic
Application
Ice Cream, Biscuit
Customized
Customized
Capacity
300-350PCS/Hour
Powder
7kw
Voltage
220V
N.W.
180kg
Dimension
1000×600×1200 mm
Transport Package
Wooden Cases
Specification
CE ISO
Trademark
MG
Origin
China
HS Code
85141090
Production Capacity
100sets/Year

Product Description

Ice Cream Wafer Cone Baking Machine
Parameters:
Model MFM-12
Capacity 300-350pcs/hour
Powder 7KW
 Voltage 220V
 N.W. 180KG
 Dimension 1000×600×1200 mm
Features:
-- Speed baking: 1-2mins
-- We can design your favorable cone shape according to your sample
-- High Production
-- Easy to operate, Easy for cleaning
-- Low noise, High Capacity with low Power
1. With excellent quality.
2. Efficency in working. 
3. Durable in using. 
4. One year warranty.
5. Suit for tea restaurant equipment, cake room equipment, coffee shop equipment, bakery equipment, western food shop equipment, drinks shop equipment, Chinese food shop equipment, leisure food factory equipment.
Remark:
1.Payment term: By T/T, the 30% of total value paid in advance as down payment, the balance 70% paid before shipment
2.warranty: For the quality of goods, the Seller gives the warranty of 12 months, issued on the day of its consignment, and guaranties that  in the mentioned period will replace or repair on the proper expenses, in the proper factory all the parts, damaged as the result of defect materials of fault execution. The appeals in the warranty period have to be under the same period.  The damages caused by the improper use, lack of knowledge of instructions or normal tear are excluded from the warranty.
3.MOQ: 1set
4. Packing: The Seller is obliged to pack the subject of the Contract for the transport in the appropriate packaging, according to the Regulations of the Seller's country.
 5.Delivery time:  Within 30 days after down payment be made
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier